Disponibilidad/precios MP1 MP2 MP3 Tiempo fab
====================== ======== ======== ======== ==========
-Canes 1 u/k 2 u/k 10 min/u
-Lives 4 u/k 0.5 u/k 15 min/u
+Canes 1 k/u 0.5 k/u 10 min/u
+Lives 0.25 k/u 2 u/k 15 min/u
Precios MP 10 $/k 15 $/k 20 $/k
Disponibilidad (sem) KMP1 k KMP2 k KMP3 k
====================== ======== ======== ======== ==========
^^^^^^^^
::
- PASTA LCR
- OPERARIOS | .-------------------.
- | | | CCR |
- | | | .----------. |
- V V V V | 10% |
- +-------------+ CF +--------+ CP +---------+
- MP1 --> | | ----> | | ----> | | --> CCA
- MP2 --> | Fabricación | | Pulido | | Control |
- MP3 --> | | ----> | | ----> | | --> LCA
- +-------------+ LF +--------+ LP +---------+
+ 2/3 +-------------+ CF +--------+ CP +---------+
+ MP2 --> | Fabricación | ----> | Pulido | ----> | Control | --> CCA
+ ,-> +-------------+ +--------+ +---------+
+ / 1/3 ^ ^ ^ | 10%
+ / MP3C | | | CCR |
+ / | | '-------------'
+ MP3 OPERARIOS PASTA
+ \ | | LCR
+ \ MP3L | | .-------------.
+ \ 8/9 V V V | 10%
+ `-> +-------------+ LF +--------+ LP +---------+
+ MP1 --> | Fabricación | ----> | Pulido | ----> | Control | --> LCA
+ 1/9 +-------------+ +--------+ +---------+
Objetivo
^^^^^^^^
-Planificar la producción de canes y lives, calculando materias primas a utilizar
+Determinar la producción de canes y lives, calculando materias primas a utilizar
(MP1, MP2, MP3 y potes de pulidor, cantidad de operarios a utilizar en la
fabricación y horas extra que puedan utilizar) y plata a pedir prestada (de ser
necesario) para maximizar la cantidad de productos a vender en la próxima
extra).
* Por cada 4 hs de funcionamiento de la mezcladora necesito un operario, si la
mezcladora trabaja sólo 4 hs necesitaré 1 operario al que le pagaré 8 hs,
- si trabajara 9 hs, necesitaré 3 operarios.
+ si trabajara 9 hs, necesitaré 2.25 operarios (porque es variable contínua).
+ Todos los operarios trabajan todas las horas.
* Los operarios de la mezcladora pueden trabajar menos de 8 hs y se les paga
por hora trabajada.
* La cantidad de productos pulidos por hora es lo que puede realizar el equipo
* Los empleados de pulido y control de calidad trabajan 8 hs diarias y no hacen
horas extra.
* El interés se paga después de la semana a planificar.
-* La demanda de canes es mínima.
+* La demanda de canes es exacta.
* La demanda de lives es máxima.
* Se trabajan 5 días a la semana.
Fabricación
^^^^^^^^^^^
E/S:
- 1 * MP2 + 2 * MP3C = CF [u/sem]
-
- 4 * MP1 + 0.5 * MP3L = LF [u/sem]
+ MP2 + MP3C = 3/2 * CF [k/sem]
+
+ MP1 + MP3L = 9/4 * CL [k/sem]
+
+Mezcla de entrada:
+ MP2 = 2/3 * (MP2 + MP3C) [k/sem]
+
+ MP1 = 1/9 * (MP1 + MP3L) [k/sem]
+
Capacidad productiva:
HS_MAQ = 1/6 * CF + 1/4 * LF [h/sem]
LF + LCR = LP [u/sem]
- CP + LP = 15 * PASTA [potes/sem] (potes de pasta)
+ CP + LP <= 15 * PASTA [potes/sem] (potes de pasta)
Capacidad productiva:
1/7 * CP + 1/5 * LP <= 8 * 5 [h/sem]
6 * CP + 4 * LP <= 8 * 5 [h/sem]
Mezcla de salida:
- (CP + LP) * 1/(1-0.1) = CCR + LCR [u/sem]
+ CP * 1/(1-0.1) = CCR + CP [u/sem]
-.. FIXME ver si está bien el factor recursivo loco este
+ LP * 1/(1-0.1) = LCR + LP [u/sem]
Financiero
^^^^^^^^^^
Demanda
^^^^^^^
Canes:
- CCA >= C1 [u/sem]
+ CCA = C1 [u/sem]
Lives:
LCA <= L1 [u/sem]
--- /dev/null
+Seventeen
+=========
+
+Resolución por método Simplex
+-----------------------------
+
+Igualdades
+~~~~~~~~~~
+2 X1 + 3 X2 + 1 X3 + 0 X4 + 0 X5 = 600
+
+0 X1 + 4 X2 + 0 X3 + 1 X4 + 0 X5 = 600
+
+2 X1 + 1 X2 + 0 X3 + 0 X4 + 1 X5 = 500
+
+MAX Z = 8 X1 + 10 X2 + 0 X3 + 0 X4 + 0 X5
+
+Vértice (0,0)
+~~~~~~~~~~~~~
++----+----+-----+------+------+------+------+------+------+------+
+| | | | 8 | 10 | 0 | 0 | 0 | | |
++ Ck + Xk + Bk +------+------+------+------+------+ Tita + Sale +
+| | | | A1 | A2 | A3 | A4 | A5 | | |
++====+====+=====+======+======+======+======+======+======+======+
+| 0 | X3 | 600 | 2 | 3 | 1 | 0 | 0 | 300 | |
++----+----+-----+------+------+------+------+------+------+------+
+| 0 | X4 | 600 | 0 | 4 | 0 | 1 | 0 | --- | |
++----+----+-----+------+------+------+------+------+------+------+
+| 0 | X5 | 500 | [2] | 1 | 0 | 0 | 1 | 250 | X5 |
++----+----+-----+------+------+------+------+------+------+------+
+| Z = 0 | -8 | -10 | 0 | 0 | 0 | |
++----+----+-----+------+------+------+------+------+------+------+
+| Entra | X1 | | | | | |
++----+----+-----+------+------+------+------+------+------+------+
+
+Vértice (225,0)
+~~~~~~~~~~~~~~~
++----+----+-----+------+------+------+------+------+------+------+
+| | | | 8 | 10 | 0 | 0 | 0 | | |
++ Ck + Xk + Bk +------+------+------+------+------+ Tita + Sale +
+| | | | A1 | A2 | A3 | A4 | A5 | | |
++====+====+=====+======+======+======+======+======+======+======+
+| 0 | X3 | 600 | 0 | [2] | 1 | 0 | -1 | 50 | X3 |
++----+----+-----+------+------+------+------+------+------+------+
+| 0 | X4 | 600 | 0 | 4 | 0 | 1 | 0 | 150 | |
++----+----+-----+------+------+------+------+------+------+------+
+| 8 | X1 | 500 | 1 | 1/2 | 0 | 0 | 1/2 | 500 | |
++----+----+-----+------+------+------+------+------+------+------+
+| Z = 2000 | 0 | -6 | 0 | 0 | 4 | |
++----+----+-----+------+------+------+------+------+------+------+
+| Entra | | X2 | | | | |
++----+----+-----+------+------+------+------+------+------+------+
+
+Vértice (225,50)
+~~~~~~~~~~~~~~~~
++----+----+-----+------+------+------+------+------+
+| | | | 8 | 10 | 0 | 0 | 0 |
++ Ck + Xk + Bk +------+------+------+------+------+
+| | | | A1 | A2 | A3 | A4 | A5 |
++====+====+=====+======+======+======+======+======+
+| 0 | X3 | 600 | 0 | 1 | 1/2 | 0 | -1/2 |
++----+----+-----+------+------+------+------+------+
+| 0 | X4 | 600 | 0 | 0 | -2 | 1 | 2 |
++----+----+-----+------+------+------+------+------+
+| 8 | X1 | 500 | 1 | 0 | -1/4 | 0 | 3/4 |
++----+----+-----+------+------+------+------+------+
+| Z = 2300 | 0 | 0 | 3 | 0 | 1 |
++----+----+-----+------+------+------+------+------+
+